UI framework
AM

Virtos operations

Charging
Beyond Limits

A compact, responsive CSS foundation for operational dashboards, admin tools and technical interfaces.

Explore components

Foundations · 01

Typography

Expanded headings establish a confident hierarchy. Public Sans keeps dense interface content clear.

Heading one

Heading two

Heading three

Heading four

Lead text introduces a page or section with extra presence.

Body copy is designed for operational clarity. Use strong text for importance, italics for emphasis, mark for highlighted content and links for navigation.

Reliable infrastructure that empowers.
— Virtos brand picture

status: ready   Press ⌘ + K to search.

Dashboard · 02

System overview

Cards organise one clear idea per module and adapt automatically to available width.

The Pioneer

Blue-sky thinking. Challenge today’s limits and make the possibilities of tomorrow feel within reach.

The Engineer

Grounded in proof. Build confidence through clear explanations, technical credibility and reliable results.

Available power
2.84 MW
Within target
Active sessions
18
Across 24 dispensers
Site efficiency
96.4%
+1.2% today
Energy delivered
12.6 MWh
Since midnight

01. Infrastructure

Deliver more power

Charge above the instantaneous grid import limit using an integrated battery front-end.

02. Reliability

Built to endure

No single point of failure on critical systems. Modular power blocks preserve availability.

99.99% uptime

03. Operations

Own the outcome

Live telemetry makes performance visible and keeps operational decisions grounded.

Inputs · 03

Forms

Labels, controls and validation are styled by element; layout helpers remain optional.

Create charging profile
Use a name operators will recognise.
Confirm this address before saving.
70% — balanced delivery

Data · 04

Tables

The responsive table becomes a labelled record list on narrow screens.

Vehicle Dispenser Started Energy Status Action
Truck 014
VRT-014
D-04 08:42 386 kWh Charging
Bus 206
VRT-206
D-11 08:16 441 kWh Limited
Truck 027
VRT-027
D-02 07:55 612 kWh Charging
Bus 118
VRT-118
D-09 07:21 507 kWh Attention

Hierarchy · 05

Trees & tree tables

Explore nested navigation or expand hierarchical operational data without leaving the current view.

Use ↑ ↓ ← → to navigate the tree.
Asset Type Output Status
Brisbane depot Site 2.84 MW Online
Power system Subsystem 2.84 MW Online
Battery bank Storage 1.20 MW 78%
Grid connection Input 1.82 MW 91%
Dispensers Group 18 active Online
D-04 Dispenser 386 kW Charging
D-09 Dispenser — Attention
The compact variant reduces cell padding and type size.

Status · 05

Feedback & progress

Profile activated

The overnight profile is now assigned to 12 vehicles.

Grid limit approaching

Site import is at 92% of its configured threshold.

Dispenser offline

D-09 stopped reporting two minutes ago.

Site capacity

Battery78%
78%
Grid import1.82 / 2 MW
91%
Dispensers18 / 24 active
75%

Native HTML · 06

Other elements

Semantic HTML receives useful defaults with minimal component classes.

Lists & definitions

  • Grid-smart architecture
  • Integrated energy storage
  • Intelligent power management
Uptime
The proportion of time a system is operational.
State of charge
Available battery capacity expressed as a percentage.

Disclosure

How is power allocated?

Power is drawn from a shared DC pool and dynamically assigned according to vehicle demand.

What happens during a grid event?

Configured policies reduce import and use available battery capacity to support active sessions.

Can operators override profiles?

Yes. Permissioned users can override limits temporarily with a recorded audit event.

Code sample

Change the system spacing from one token:

:root {
                  --v-space-5: 1.5rem;
                  --v-accent: #24df92;
                  }

Confirm action

Start charging profile?

This will apply the overnight fleet profile to 12 connected vehicles.